For more details, look at my thread Planning a Rollbar.
This thread shows close up photos of the fabrication.
The whole thing can be made with simple tools, the only special ones are the tube notcher (Harbor Freight Tools) and a wire feed welder.
It takes about 3-days to fab it all up (6 hour days) and a day to fully weld it.
What would I do different? Probably have both of the main hoop lower legs bent inward maybe one inch to make it easier to fully weld the adjuster tube place.
This thread shows close up photos of the fabrication.
The whole thing can be made with simple tools, the only special ones are the tube notcher (Harbor Freight Tools) and a wire feed welder.
It takes about 3-days to fab it all up (6 hour days) and a day to fully weld it.
What would I do different? Probably have both of the main hoop lower legs bent inward maybe one inch to make it easier to fully weld the adjuster tube place.
Comment