The engine bay still has dirt and undercoating. It will get cleaned up of course. Plus the wiring will be minimized and tucked after the car is up and running.
.755 5th gear set (thanks azgtx) ready for install. Also have a .717 set coming from Jake in the form of another tranny. That'll probably be better given the amount of HP planned.
I know they are just Daisy wheels but will be pretty cool after some powder coating and a little machining. I am pumped about these.
MSII also from Jake. plus the small laptop that will find its way into the car in the form of a mount on the pass side of the center console. Tune while at red lights or whatever. No tuning while driving cause that would be illegal. lol
New (not reman'ed) set of the very large EMPI G-series axles. They have just been sitting in a car outside for a long while. They will also get the powder coating treatment.
'05 Rio knuckles ready for new rotors, bearings and later on powder coating too.
just for comparisons sake. Festiva vs. XR2 (top)
99% of the dirt seen in the fender wells was from me getting the car into the garage from the driveway. Jake and I trailered it home from Eastern PA in full snow storm with salt everywhere. I hated it since in 21+ years it was the first time the car had seen anything like it. I felt bad for it the whole way. LOL
Comment